The audit lifecycle, end to end

Plan, scope, test, conclude, report, follow up. The same sequence you already run, with the evidence trail enforced by the database rather than promised by the interface.

01 Plan

The plan is drawn from the universe

The audit universe is the population of auditable entities. The annual plan is drawn from it rather than assembled in a document that sits beside it.

A plan that cannot be traced back to a population is a plan that has to be defended from memory.

02 Scope

Scope is set against the risk and control matrix

An engagement carries its scope and its timing. The risks and the controls that address them live in the matrix, and scope is set against that.

The matrix is the spine. Everything the fieldwork produces hangs off a control that is already in it.

03 Test

Fieldwork produces work papers, and work papers carry their own history

Evidence is gathered against the controls in scope, in work papers.

Work paper events are hash chained. Each event covers the one before it, so the sequence of what happened to a work paper is part of the file rather than a log somebody could quietly tidy.

04 Conclude

The assertion and the test stay separate

What a control owner says about a control and what an auditor found are recorded separately, in the same place, and are never merged into one number.

Most tools collapse those two into a single rating. Once collapsed, the question of who said what is unanswerable, and that is usually the question the audit committee asks.

05 Report

The report comes out of the file

What goes to the audit committee is drawn from the file the work was done in.

A report retyped out of a system is a second copy of the truth, and second copies drift.

06 Follow up

A finding does not end when the report goes out

Findings are recorded against the control and the engagement they came from.

A correction appends rather than overwrites, so the history of a finding stays readable after the engagement closes.

Against now

Against what you are doing now

Spreadsheets, a shared drive, or a tool bought for a different market. No competitor is named here, favourably or otherwise.

  • Provenance
    Now

    A cell changes in a spreadsheet and nothing records who changed it or what it said before.

    Here

    Assessments append. Work paper events are hash chained and the chain can be verified on screen.

  • Assertion and test
    Now

    The owner said and the auditor found are commonly collapsed into one rating.

    Here

    Four cells. An assertion and a test never overwrite each other.

  • Regulatory content
    Now

    Assumed, or maintained by hand in a document nobody owns.

    Here

    A jurisdiction pack selected at onboarding, named on screen, and marked provisional pending counsel review.